Digital infrastructure development

From land and power to execution.

Andeon originates, structures and advances data center development opportunities across Argentina and Latin America, coordinating the legal, energy, financial and real estate workstreams required to make complex infrastructure projects executable.

PL.01Land & site control
PL.02Power & utility coordination
PL.03Legal & regulatory structuring
PL.04Capital strategy
PL.05Commercial agreements
PL.06Execution planning

Market thesis

Compute demand is moving faster than infrastructure can be delivered.

AI, cloud and enterprise workloads are reshaping the physical requirements of digital infrastructure. The constraint is no longer only technical capacity inside the building. It is the ability to secure power, land, permits, capital and stakeholder alignment before demand moves elsewhere.

Power
Land
Permits
Capital

CH.02 — Platform

Development platforms for data center infrastructure.

Andeon starts before the building: with land, power, legal control, capital logic and commercial structuring.

Powered land

Identification, control and preparation of sites with electric potential, access, zoning and expansion logic.

CH.03 — Capabilities

One platform across the data center development lifecycle.

An editorial operating table: no icon grid, no generic claims, just the workstreams that must be coordinated to make a project executable.

Site origination & land strategy

Screening · Owner negotiation · Title diligence · Easements · Access · Expansion · Municipal and provincial relationships

Power & utilities

Capacity mapping · Utility coordination · Interconnection strategy · PPAs · On-site or near-site generation · BESS · Backup · Resilience

Legal & regulatory structuring

SPVs · Land contracts · Permits · Zoning · Environmental and water diligence · Local and international advisors · Investor documentation

Capital & project finance

Capital stack · Equity · Debt · Strategic capital · Joint ventures · Phase models · Bankability · Risk allocation · Investment memoranda

Commercial & offtake

Operators · Tenants · Demand partners · Build-to-suit frameworks · LOIs · MOUs · Term sheets · Capacity reservation logic

Execution & delivery planning

Milestone roadmap · EPC selection · Engineering · Procurement · Pre-construction · Capex phasing · Governance · Sponsor reporting

CH.04 — Development path

From opportunity to executable infrastructure

A stage-by-stage control tower for data center development.

CH.05 — Framework

The Andeon Development Framework.

A repeatable path from raw opportunity to execution readiness.

01

Originate

Detect opportunities with real land, power and demand potential.

02

Control

Secure rights over land, access, power path and preliminary agreements.

03

Structure

Create the legal, financial and commercial project container.

04

De-risk

Resolve diligence, permits, utilities, water and stakeholder issues.

05

Package

Translate complexity into a legible opportunity for capital and demand.

06

Execute

Coordinate engineering, procurement, EPC, governance and phasing.

CH.06 — Region

A regional platform for the next wave of digital infrastructure.

Argentina and Latin America offer a rare combination of land availability, energy resources, technical talent and strategic geography. The opportunity is not simply to build capacity, but to structure projects correctly from the first decision.

  • Large-scale land opportunities.
  • Energy-rich regions and diversified power strategies.
  • Growing need for cloud, AI and enterprise infrastructure.
  • Institutional capital entry through structured vehicles.
  • Global-standard diligence for local infrastructure assets.

CH.07 — Profiles

Illustrative development profiles.

Conceptual opportunity types Andeon can advance without exposing confidential pipeline.

PR.01

Powered land campus

Potential100–500+ MW
PhasingMulti-phase
UtilityCoordination required
FiberMulti-route potential
PR.02

Energy-adjacent data center site

PositionNear grid / generation
SupplyPPA pathway
ResilienceBackup strategy
PR.03

Build-to-suit campus

DemandTenant-led
DesignUse-case specific
CommercialCapacity reservation
PR.04

Investment-ready development vehicle

PackageLand + legal + model
DiligenceInstitutional standard
Next stepCapital partner

CH.08 — Ecosystem

Built with the partners required to move infrastructure.

Data center development requires parallel coordination across disciplines that rarely move at the same speed. Andeon acts as the project integrator.

01
Legal & regulatory advisors
02
Utilities & energy developers
03
Landowners & local developers
04
Engineering & EPC partners
05
Capital providers
06
Data center operators & demand partners
07
Government & institutional stakeholders

CH.09 — Execution

Built for institutional-grade execution.

Andeon is assembling the legal, financial, energy and real estate capabilities required to originate and structure data center developments in markets where infrastructure readiness will determine who captures the next wave of compute demand.

01

Confidential opportunities under evaluation.

02

Workstreams spanning land, power, legal, capital and demand.

03

Designed for investor, operator and utility diligence.

04

Regional platform thesis across Argentina and Latin America.

Final CTA

Let’s structure the next digital infrastructure opportunity.

If you control strategic land, operate energy assets, deploy institutional capital or need scalable data center capacity, Andeon can help evaluate and structure the path from opportunity to execution.

hello@andeon.io · Buenos Aires, Argentina